Branded towers are having a moment in Miami.
Car brands. Fashion brands. Restaurant brands. If it has a logo, someone is building a condo with it. I’m waiting for the first branded tower from a grocery store. Residents get a reserved parking spot and a free Pub Sub on Thursdays.
The client
Last month a client wanted to buy pre-construction in one of these new branded towers. She loved the design, the location, the amenities. She’d seen the sales center. She was ready.
And I said what I always say: “Wonderful. Now let’s read the contract.”
Why it matters
A pre-construction contract is written by the developer’s lawyers, for the developer. That’s not a conspiracy, that’s just how it works. The buyer signs it years before the building exists, and the contract decides what happens in all those years.
So our attorney and I sat with it and went clause by clause, and we highlighted for her the parts she needed to understand before signing. The kind of things that live in most developer contracts:
- What the developer can change. Finishes, layouts, square footage within a range, even some amenities. “Substantially similar” is doing a lot of work in these contracts.
- When it has to be finished, and what happens if it’s late. How late is too late? Who decides?
- The deposit schedule. How much, when, where it’s held, and when it can be used.
- What happens if you can’t close. Spoiler: it’s usually not good for the deposit.
- Closing costs. Developer closings can include costs you wouldn’t see in a normal resale.
- Rental and resale rules. Can you rent it? Short term? Can you assign the contract before closing?
The questions I ask out loud
When I read a developer contract with a client, I like to ask the uncomfortable questions out loud, so she hears them before she signs:
If they change the kitchen, do you have to accept it? If the building is two years late, can you get your deposit back? If you lose your job in year two, what happens to the money you already put down?
Nobody wants to think about those questions in a beautiful sales center. That’s exactly why we ask them in the attorney’s office, with bad coffee and good highlighters. I own highlighters in five colors. Yellow means “ask the attorney.” Pink means “absolutely not.”
What we actually found
Two things in her contract made me sit up.
The first was an escalation clause. In plain English: even after you agree on a price, the developer could raise it, up to about 10%, under certain conditions. That’s not a typo. A price that can move after you sign is not really a price. It’s an opening bid in a fancy font.
The second was the deposit schedule. The sales team explained it one way on the phone. I asked them to write it into the contract exactly, line by line: a slice at signing, a slice at 30 days, another at 180 days, one when construction reaches her floor, one at top-off, and the rest at closing. If it isn’t in the contract, it didn’t happen.
We also had to redo the contract once so it would be in the name of her company instead of her personal name. Small thing, but it’s much easier to fix before you sign than after.
How it ended (for now)
Here’s the plot twist nobody puts in the brochure: the developer can walk, too.
Moving a large deposit from another country takes time. Banks, exchange rates, transfer limits. My client is also a very busy professional who spends long days at work. The developer gave us a window to sign and fund. When we couldn’t meet it, they cancelled and released the unit. A few weeks later, prices in the building went up.
Was I sad? Yes. It was a great opportunity. But she didn’t lose a dime, she understood every clause before signing, and she’s coming back when the exchange rate makes sense. That’s a good outcome, even if it doesn’t feel like one in the moment.
If you’re buying pre-construction
- Get an attorney who does this. Not your cousin who did your divorce.
- Read the contract, not the brochure. The brochure isn’t signed.
- Ask what’s negotiable. Sometimes more than you think, especially for early buyers.
- Have your money ready to move. Pre-construction timelines are the developer’s, not yours. Know how long your bank takes for a big international wire before you reserve.
- Keep everything. Floor plans, emails, the finish sheet. Years from now, you’ll want them.
Renderings are beautiful. Contracts are forever. Read the forever part. Then read it again, in pink.
— Arianne